Project Overview

BFS was engaged as the fire designer for a comprehensive fire system upgrade project at 440 Victoria Street, Wetherill Park. The property contains various NCC classes, This initiative, which underscored our dedication to professionalism and excellence, encompassed several crucial components to enhance the site's fire protection infrastructure. Additionally, our professional collaboration with other services was a key aspect of this project. We are committed to pushing the boundaries of innovation while maintaining a strong foundation in best practices.

Upgrade of Fire Tanks and Diesel Fire Pumps

The project included the replacement and relocation of two fire tanks, two fire pumps, and a booster assembly. Two 160kL fire tanks were upgraded and relocated to new positions on the site. This task was undertaken to ensure optimal water storage capacity and accessibility for fire suppression.


Two diesel fire pumps were upgraded and relocated. These upgrades were necessary to enhance the efficiency and reliability of the fire suppression system. By integrating sustainable practices with advanced technologies, we ensure a forward-thinking approach that addresses both current and future needs. 

Booster Assembly Relocation

A new booster assembly was installed at a new location due to the change in the property boundary. The relocation design complied with AS 2419.1:2021 and ensured ease of access for fire brigades. 

Professionalism and Expertise

1. Advanced Coordination

  •  Meticulous coordination was conducted to ensure that all components were relocated and upgraded without disrupting the existing operations of the site. 

2. Compliance and Safety

  • All upgrades and relocations were executed in strict compliance with relevant standards and regulations. Additional safety measures were implemented to address the specific conditions of the site.

3. Innovation Design

  • The new pipe route design incorporated innovative solutions to ensure optimal performance and reliability of the fire system. Both above-ground and underground sections were carefully planned to maximize efficiency.

4. Quality Assurance

  • Rigorous inspection and testing were conducted at every stage of the project to ensure that all components met the highest quality standards. This approach minimized potential issues and ensured the long-term reliability of the fire system.

5. Client Collaboration

  • Continuous communication and collaboration with the client were maintained throughout the project. This ensured that all requirements and expectations were met, resulting in a successful project outcome.


This project exemplifies our dedication to delivering high-quality results that resonate with both stakeholders and the broader community.

Gallery Showcase

1/5

Follow BFS on social media

Copyright © 2020 Building Fire Services - All Rights Reserved.

Powered by

Cookie Policy

By continuing to use this site, you accept our use of cookies.

Accept & Close