At BFS, we provided fire protection services for two Medtronic projects at 11 Khartoum Road and 2 Alma Road, both led by Decobu as the head consultant. Our role was to ensure compliance, safety, and seamless integration with the existing infrastructure while minimizing disruptions.
Medtronic is a globally recognized leader in medical technology, operating in over 150 countries and pioneering innovative healthcare solutions. As an industry-leading company, Medtronic upholds strict safety and compliance standards for its facilities. Our fire protection designs for these projects had to meet local regulatory requirements while aligning with Medtronic’s global safety expectations, ensuring a secure and sustainable working environment.
This project involved the fit-out of two levels (Levels 8 & 9) in an existing building, with which designated as an office space a dedicated training facility for employees. Our fire protection design had to integrate seamlessly with the existing systems while maintaining full compliance.
Scope of Work:
Innovative Design Highlight:
Key Considerations:
The 2 Alma Road project was another Medtronic office fit-out. Our task was to modify and enhance the existing fire protection system to align with the new tenant layout.
Scope of Work:
Key Considerations:
In both projects, we worked closely with Decobu and multiple specialized consultants, including electrical, mechanical, and hydraulic engineers. Since these projects involved modifications to existing buildings, rather than new constructions, cross-disciplinary collaboration was essential to ensure system compatibility and functionality.